Heat supply

We supply heat to the site: our own equipment, our own staff, a regulated tariff

For municipal and state institutions: we build the heat source, operate it and supply heat throughout the heating season.

100 kW to 5 MWnatural gas, coal, wood fuelsall of Ukraine

Call +380 50 102 99 99

Hours Mon–Fri 09:00–17:00 (Kyiv time)

Wood fuels: briquettes, pellets, firewood.

Procurement documents

Business model

Heat, not equipment

Heat on site
Throughout the heating season.
Metering
By a heat meter.
Payment
For heat actually consumed, at the regulated tariff.
No equipment of your own
The customer needs no equipment, staff or permits of their own.

What we do not sell separately

We do not sell design, manufacturing, installation or maintenance of third-party heat plants as separate services. The cycle is indivisible: we take on the whole site.

Process

How it works

  1. Cooperation agreement
  2. Site audit
  3. Factory-built modular heat plant: manufacturing, installation, commissioning. Or installation of equipment in the customer's premises
  4. Start-up and adjustment
  5. Heat supply contract
  6. Heat supply, metering by a heat meter
  7. Payment for heat actually consumed, at the regulated tariff
Diagram · From contract to heat supply

The cycle does not end: we operate the plant and supply heat for as long as the contract is in force.

From contract to first heat on site: 3–6 months.

Scope of work

What is included

Approvals

  • Emission permit
  • Licenses and declarations
  • Approvals from public authorities
  • Tariff calculation and approval
  • Lease agreements for state property
  • Heat supply contract
  • Employment contracts with staff

Engineering

  • Design and technical documentation
  • Manufacturing of a modular heat plant or a built-in solution in the customer's premises
  • Start-up and adjustment

Operation

  • Staff on site
  • Maintenance of heat-generating and power-generating equipment
  • Metering of heat supplied
  • Dispatching and remote monitoring
  • Heat supply

Administration

  • Engineering staff and technical supervision
  • Field service
  • Accounting, reporting, taxes

Operation during outages

Energy resilience of the site

The solution is designed to keep working during grid outages:

  • backup power for controls, pumps and fuel feed;
  • an on-site heat source, without long heating mains;
  • no single point of failure: damage to one source does not leave other sites without heat;
  • on-site fuel reserve (for solid fuel).
External gridBackup powergenset with ATSControlspumps,fuel feedHeat sourceon siteno heating mainsFuel reservesolid fuelInstitutionbuildingheat
Diagram · On-site heat source and backup power

Heat supply and backup power are the two core lines of the group. The heat plant and its backup power are designed, installed and maintained by one team.

Genset maintenance and repairs

Customers

Who we serve

We supply heat to:

  • infrastructure facilities
  • the social sector: schools and kindergartens, hospitals, cultural centers, geriatric care centers, residential care institutions
  • defense sector customers
  • territorial communities (hromadas)
  • municipal enterprises

Figures

Heat supply in figures

heat supply sites in operation (November 2026)
20+
sites under construction at the same time
up to 5
from contract to first heat
3–6 months
heat generation efficiency on new equipment
~92%
of operating equipment in wartime conditions
almost 5 years

Heating cost savings

Natural gasup to 30%
Coalup to 40%
Wood fuels: briquettes, pellets, firewoodup to 50%

Compared with the customer's current heating costs. Actual savings depend on the site and the fuel.

Documents

Procurement documents

Heat supply license, ISO certificates, State Labour Service declaration and procurement references — available on request.

List of documents

Contacts

Heat supply inquiries

Hours
Mon–Fri 09:00–17:00 (Kyiv time)
Address
16 Stepana Bandery Ave., Kyiv 04073, Ukraine